For questions about the King County  Puget Sound Marine Monitoring Program, please contact Kimberle Stark, Program Manager

2004 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation

About this Document

2004 Eelgrass Monitoring report coverThis report describes activities through calendar year 2004 on two major pre-construction eelgrass mitigation tasks. The first was a pre-construction eelgrass mapping survey by side-scan sonar and underwater videography, which covered the entire nearshore area from approximately 65 meters north of the Marine Outfall Corridor to approximately 10 meters south of the Eelgrass Reference Area, and offshore (west) to a depth of -25 feet mean lower low water. The second pre-construction eelegrass mitigation task involved harvesting of eelgrass shoots from the study area (marine outfall corridor) for propagation and stockpiling, which will occur over the 5-year pre-construction period, with the goal of providing a sufficient stock of local plants for post-construction site restoration. Experimental harvest plots in the outfall corridor area will be monitored to determine recovery rates relative to harvest rates, to determine an optimum harvest rate that allows for rapid recovery of donor eelgrass beds.

Viewing the Document

This report is provided in Adobe PDF format. You will need Adobe Acrobat to view the document. If you do not have this software, you can download a free copy of Adobe© Acrobat© Reader

Download the Report

2004 Eelgrass Monitoring Report

To top
Updated: 12/16/2008